NEWS‎ > ‎

Krum Installation Date Set

posted May 22, 2015, 8:51 AM by JRLopez TriCitiesRACES
We have a date of June 1st as our day of install of the 5Ghz and 2.4Ghz MESH Network nodes for the group.  We will have a high point for our member to connect their Nodes to.  It is goal to connect all three City Emergency Operations Centers to an outside data link capable of VOIP phone connectivity, shared data files, surveillance cameras and other types of TCP/IP applications that are being developed just for emergency communications operations.

Also on the that sight is a 5Ghz link to a Node on the south facing side of Santiago Peak. that Node is used by others in South Orange County for MV RACES and Personal Mesh Use. We will have the ability to turn that link on and off if needed to support longer range connectivity or Internet access on the system.

If you have a Node ready and live in "line of sight" of the Krum Reservoir point your antenna and connect.

See this Map for the exact location     Krum Reservoir




Comments